Timeline

Feasibility Study
Phase 1 2006 – 2008
  • Determine estimated costs for a streetcar system
  • Determine feasibility of constructing a streetcar system
  • Identify possible alignment concepts for a streetcar system


Project Definition
Phase 2 2009
  • Developing a Funding and Operating Plan
  • Refine the conceptual alignments
  • Perform conceptual engineering and design


Alternative Analysis/Environmental Review
Phase 3 2010 – 2012
  • Evaluate alternative transit technologies and alignments
  • Analyze environmental impacts
  • Preliminary engineering


Construction
Phase 4 2012 – 2014
  • Final design and engineering
  • Track installation
  • Construction of maintenance facility
  • Purchase cars
  • OPENING DAY!